Costs
January 2006
The total costs of this project are *:
* These costs were all calculated in advance. In the end the real costs were less. With the rest of the money we were able to buy two pieces of banana land to feed the elephants.
| Kostenpost | Amount (in Euro) |
| Preparations in Thailand | |
| Research (2 months) Ticket and visa Materials tentcamp Laptop, camera, satellitephone Subtotaal |
200 350 500 100 1.150 |
| Tour (2 months) | |
| Two elephants Papers Medical costs Wage for four mahouts Wage for two helpers Wage for driver / guide Food for two elephants Food for group of min. 6 people Extra for during the walk Rent Jeep Fuel Subtotal |
14.000 1.500 1.000 1.200 400 500 1.100 500 7.850 1.400 700 30.150 |
| After the walk | |
| Arrangements at the park for two new elephants Amount for taking care of the elephants at the park Start of adoption program Subtotal |
1.500 8.000 1.000 10.500 |
| TOTAL | 41.800 |




